Skip to main content
CIC

About "Life First"

The “Life First” is an industry-wide construction safety campaign which gathers efforts from all stakeholders with an aim to enhance safety awareness among the construction industry and raise safety standards on sites.

Following the official launch of the campaign on 5 August 2020, the management of participating companies will kick-start the campaign in any date within August and conduct site safety review as well as relevant activities for no less than 5 days.

It is recommended to conduct a review and personnel at all levels shall inspect their own works and the potential risks involved. Top management will conduct site walk with consultants, resident site personnel and site management teams to review site operation and risk management, implement improvement measures, as well as to deliver key safety messages to all levels of workforce. Meanwhile, briefings on specific topic related to high risk activities, such as working at height, heavy lifting, temporary works, electrocution, struck by moving machinery, working under hot weather period and COVID-19 related issues and etc., shall be delivered to workers at sites, aiming to greatly strengthen the safety awareness among workers.

Every member in the construction industry has a shared responsibility for construction safety. We look forward to your participation and support for the “Life First” campaign. Please join us!


FrameworkLIST OF REFERENCE MATERIALS

Contact Us

Email: lifefirst@cic.hk
Phone: 2100 9691 / 3199 7205

Support from Industry Stakeholders

01 Ir LAM Sai Hung, JP.jpeg 02 Mr CHAN Ka Kui, SBS, JP.jpeg 03 Ir Dr PANG Yat Bond, Derrick, JP.jpeg 04 Ir CHENG Ting Ning, Albert.jpeg
Ir LAM Sai-hung
Permanent Secretary for Development (Works)
Mr. CHAN Ka-kui
Chairman, Construction Industry Council
Ir Dr. Derrick PANG
Chairperson, Committee on Construction Safety, Construction Industry Council
Ir Albert CHENG
Executive Director, Construction Industry Council

  19 Ir WAI Chi Sing, GBS, JP, FHKEng.png 05 Ir Kevin Poole.png 09 Ms Connie YEUNG.png  
  Ir WAI Chi-sing
Managing Director, Urban Renewal Authority
Ir Kevin POOLE
Executive Director, Third Runway, Airport Authority Hong Kong
Ms. Connie YEUNG
Deputy Director (Development & Construction), Hong Kong Housing Authority
 

20 Mr KUOK Hoi Sang.png 06 Victor KWOK.png 07 YU Wai Wai.png 13 Ir Conrad WONG.png
Mr. KUOK Hoi-sang
Chairman and Managing Director, Chevalier Group
Mr. Victor KWOK
General Manager of Project Management (2) Department, Henderson Land Development Company Limited
Mr. YU Wai-wai
General Manager of Project Management (1) Department, Henderson Land Development Company Limited
Ir Conrad WONG
Managing Director, Yau Lee Holdings Limited

  17 Ir Derek ZEN.png 12 Ir Danny HUNG.png 15 Ir Wes JONES.png  
  Ir Derek ZEN
Chairman, Build King Holdings Limited
Mr. Danny HUNG
Executive Director & President, China State Construction International Holdings Limited
Ir Wes JONES
Managing Director, Dragages Hong Kong Limited
 

  16 Mr CHU Tat Chi.png 11 Ir Thomas HO, JP.png 14 Mr James LEE.png  
  Mr. CHU Tat-chi
Managing Director, Hip Hing Construction Company Limited
Ir Thomas HO
Chief Executive, Gammon Construction Limited
Mr. James LEE
Chief Executive Officer & Executive Director, Paul Y. Engineerging Group
 

22 Ir Ringo Yu.png 10 Ir Allan CHAN.png 24 Sr Thomas Tse.png 21 Ir Rocky Poon.png
Ir Ringo YU
Immediate Past President, The Hong Kong Institution of Engineers
Ir Allan CHAN
President, Hong Kong Construction Association
Sr Thomas TSE
Chief Executive, Hong Kong Construction Association
Ir Rocky POON
President, The Hong Kong Federation of Electrical and Mechanical Contractors Limited

  23 Ir Dr Sammy Y N CHAN.png 08 Prof Bernard LIM.png 18 Ir Dr Francis WONG.png  
  Ir Dr. Sammy Y N CHAN
Chairman, WONG & CHENG Consulting Engineers Limited
Prof. Bernard LIM
Principal, Architecture Design and Reserach Group Limited (AD+RG)
Ir Dr. Francis WONG
Director, Hong Kong Institute of Construction
 


Participating Organisations

Clients

  • Central Profit Investment Limited
  • Chevalier International Holdings Limited  
  • Chinachem Group
  • China Poly Group Corporation Limited
  • Denco Properties Limited
  • Empire Group
  • Funing Property Management Limited
  • Full Well Engineering Limited
  • Global Switch
  • Golden Centurion Limited
  • Goldin Financial Holdings Limited
  • Great Prosper Development Limited
  • Great Top Development Limited & Luxmark Investment Limited
  • Henderson Land Development Company Limited
  • Hong Kong- Macao Conference Holding Limited
  • Hong Yip Service Company Limited
  • Kai Shing Management Services Limited
  • Leader Bright Limited
  • Massive Leader Limited
  • Million Prospect Investment Limited
  • Minmetals Land Limited
  • New Life Plastics Limited
  • New World Development Company Limited
  • Newex Limited
  • Owners’ Corporation of Trafalgar Court
  • Paliburg Holdings Limited
  • Rich Asia Management Limited
  • Rich Union Development Limited
  • Road King Infrastructure Limited
  • Shum King Company Limited
  • Sino Group
  • Sky Asia Properties Limited
  • Sky Castle Limited
  • Smart Charm Holding Limited
  • Southwater Hong Kong Limited
  • Success Sheen Limited
  • Sunrich Development Company Limited
  • Swire Properties Limited
  • Taikoo Place Holdings Limited
  • Top Genius Holdings Limited
  • Top Harmony Development Limited
  • Towereed Properties Development Limited
  • Unicorn Bay (Hong Kong) Investments Limited
  • Vanke Holding (Hong Kong) Company Limited
  • Wheelock Properties (Hong Kong) Limited
  • World Fame Shipping Limited

Contractors


Civil Engineering and Development Department

  • Development at Anderson Road – Site Formation and Associated Infrastructure Works
  • Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 2
  • Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 3
  • Site Formation and Infrastructure Works near Tong Hang Road and Tsz Tin Road in Area 54, Tuen Mun
  • CEDD Maintenance Contract for Seawalls and Navigation Channels (2016-2021)
  • Queen’s Hill Development - Road and Drainage Works
  • Queen’s Hill Development - Sewage Pumping Station Works
  • Infrastructural Works for Public Housing Development at Chung Nga Road and Area 9, Tai Po
  • Kai Tak development – stage 4 infrastructure at the former runway and south apron
  • Construction of Government Flying Service Kai Tak Division
  • Trunk Road T2 and Infrastructure Works for Developments at the Former South Apron
  • CEDD Term Contract for Minor Works (2020-2023)
  • The Rehabilitation of Lam Tei Quarry – Extended Works
  • LPMitP-2014, Package B, Landslip Prevention and Mitigation Works
  • Landslip Prevention and Mitigation Programme, 2014, Package I, Landslip Prevention and Mitigation Works
  • Landslip Prevention and Mitigation Programme 2017, Package K, Landslip Prevention and Mitigation Works
  • Landslip Prevention and Mitigation Programme 2018, Package K, Landslip Prevention and Mitigation, Works in Hong Kong Island, Kowloon, the New Territories and Outlying Islands
  • LPMitP-2014, Package G, Landslip Prevention and Mitigation Works
  • Landslip Prevention and Mitigation Programme, 2016, Package D, Landslip Prevention and Mitigation Work
  • Landslip Prevention and Mitigation Programme, 2016, Package F, Landslip Prevention and Mitigation Work
  • LPMitP-2017, Package H, Ground Investigation for Landslip Prevention and Mitigation Works
  • Ground Investigation - New Territories East
  • Kai Tak Development - Stage 2 Infrastructure Works for Developments at the Southern Part of the Former Runway
  • Kai Tak Development - Stage 3B Infrastructure at Former North Apron Area
  • Site Formation and Infrastructure Works for Police Facilities in Kong Nga Po
  • Kwu Tung North New Development Area, Phase 1: Site Formation and Infrastructure Works
  • Kwu Tung North New Development Area, Phase 1: Roads and Drains between Kwu Tung North New Development Area and Shek Wu Hui
  • Kwu Tung North and Fanling North New Development Areas, Phase 1: Development of Long Valley Nature Park
  • Fanling North New Development Area, Phase 1: Fanling Bypass Eastern Section (Shung Him Tong to Kau Lung Hang)
  • Fanling North New Development Area, Phase 1: Reprovisioning of North District Temporary Wholesale Market for Agricultural Products
  • Site Formation Works at Remaining Part of Tai Po Area 39
  • Tseung Kwan O - Lam Tin Tunnel - Main Tunnel and Associated Works
  • Tseung Kwan O - Lam Tin Tunnel - Road P2 and Associated Works
  • Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site
  • Development of Anderson Road Quarry site - Pedestrian Connectivity Facilities Works Phase 1
  • Tseung Kwan O - Lam Tin Tunnel - Tseung Kwan O Interchange and Associated Works
  • Development of Anderson Road Quarry Site - Road Improvement Works and Pedestrian Connectivity Facilities Works Phase 2A
  • Widening of Tai Po Road (Shatin Section)
  • Cross Bay Link, Tseung Kwan O - Main Bridge and Associated Works
  • Landslip Prevention and Mitigation Programme, 2014, Package B, Landslip Prevention and Mitigation Works
  • Landslip Prevention and Mitigation Programme, 2014, Package I, Landslip Prevention and Mitigation Works
  • Kai Tak Development – Stage 5B Infrastructure Works at the Former North Apron Area
  • Proposed Residential Development at Tuen Mun Town Lot No. 520, Kwun Chui Road
  • Kwu Tung North New Development Area Phase 1
  • Cycle track between Tsuen Wan and Tuen Mun - Advance Works
  • Landslip Prevention and Mitigation Programme, 2017 Package D, LPMit Works
  • Tseung Kwan O – Lam Tin Tunnel, Tseung Kwan O Interchange and Associated Works
  • Development of Anderson Road Quarry Site - Road Improvement Works
  • Liantang / Heung Yuen Wai Boundary Control Point, Site Formation and Infrastructure Works
  • Infrastructure Works for Public Housing Development at Area 54, Tung Chung
  • Footbridge across Hip Wo Street near the junction of Hip Wo Street/Mut Wah Street
  • Handling of Surplus Public Fill

Back to Participating Organisations


Construction Industry Council

  • Main Contract for Renovation Works at Kowloon Bay Campus, Kwai Chung Campus and Sheung Shui Campus for Hong Kong Institute of Construction (HKIC)

Back to Participating Organisations


Bouygues Travaux Publics

  • Trunk Road T2 and Infrastructure Works for Developments in the Former South Apron
  • Tuen Mun-Chek Lap Kok Link - Northern Connection Sub-sea Tunnel Section
  • Causeway Bay Typhoon Shelater to Admiratly Tunnels
  •  Inter-Reservoirs Transfer Scheme - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir 
  •  Central Kowloon Route - Central Tunnel  

Back to Participating Organisations


Rich Asia Management Limited

Yau Lee Construction Company Limited

Yau Lee Building Construction & Decoration Company Limited

  • Main Contract for Renovation Works at Kowloon Bay Campus, Kwai Chung Campus and Sheung Shui Campus for Hong Kong Institute of Construction (HKIC)
  • Construction of Open Space in Area 47 and 48, North District
  • Construction of Subsidised Sale Flats Development at Diamond Hill Comprehensive Development Area
  • Construction of Public Housing Developments at North West Kowloon Reclamation Site 6 and Fat Tseung Street West
  • Construction of Subsidised Sale Flats Development at Queen's Hill Site 1 Phase 3 and Portion of Phase 6, Fanling
  • HKSH Eastern District Advanced Medical Centre
  • Proposed Development For URA Project at Pine Street / Oak Street

Back to Participating Organisations


Chun Wo Group

Vasteam Construction Limited

  • Shek Wu Hui effluent polishing plant - Main Works Stage 1 - Civil Works for Sludge Treatment Facilities and 132kV Primary Substation
  • Uprating of Chai Wan Salt Water Supply System - Mainlaying and Upgrading of Siu Sai Wan Salt Water Pumping Station
  • Main Contract for Subsidized Sale Flats Project at Shatin Area 36C
  • Revamp of Public Toilets at Terminal Buildings at Airport
  • Construction of Reprovisioning Facilities at Hong Ning Road Park and Ngau Tau Kok Fresh Water Service Reservoir
  • Construction of Phase 1 Redevelopment of Ming Wah Dai Ha Shau Kei Wan, Hong Kong
  • Alternations, Additions, Maintenance and Repair of Buildings and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible (Designated Contract Area: Tai Po, North District and Outlying Islands (North))
  • Queen’s Hill Development - Road and Drainage Works
  • Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site
  • In-situ Reprovisioning of Sha Tin Water Treatment Works (South Works) - Advance Works
  • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phases 7 and 8
  • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phase 11
  • CWB Tunnel (NP section) and IEC Link
  • Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 3
  • Construction of Government Flying Service Kai Tak Division
  • Rehabilitation of Trunk Sewers in Tuen Mun
  • Hong Kong Disneyland Resort Project – Arendelle Completion Package
  • Alterations, Addition, Maintenance and Repair of Buildings and Lands and Other Properties for which the ASD (Property Services Branch) is Responsible for Central, Peak and Mid-levels
  • Foundation for Public Housing Development at Tuen Mun Area 29 West
  • Foundation for Public Housing Development at Anderson Road Quarry Site RS-1
  • Revamp of Public Toilets at Terminal Buildings at Airport
  • Foundation for Public Housing Development at Tung Chung Area 99
  • Foundation, ELS and Excavation Works for Proposed Residential Development at Yan Tong Inland Lot No. 44, Junction of Shung Shun Street and Yan Yue Wai
  • Foundation for Public Housing Development at North West Kowloon Reclamation (NWKR) Site 1 (East)
  • Construction of Public Housing Development at Hiu Ming Street
  • CMME at Race Course 

Back to Participating Organisations


Kwan Lee Holding Limited

  • Shek Wu Hui effluent polishing plant - Main Works Stage 1 - Civil Works for Sludge Treatment Facilities and 132kV Primary Substation
  • Kwu Tung North New Development Area, Phase 1: Roads and Drains between Kwu Tung North New Development Area and Shek Wu Hui
  • Shek Wu Hui Effluent Polishing Plant - Main Works Stage 1 - Civil Works for Sewage Treatment Facilities

Back to Participating Organisations


Drainage Services Department

  • Construction of an additional Sewage Rising main between Tung Chung and Siu Ho Wan and associated works
  • Cross Bay Link, Tseung Kwan O - Road D9 and Associated Works
  • Rehabilitation of Trunk Sewers in Tuen Mun
  • Minor Civil Engineering Works for Various Sewage Treatment Plants and Pumping Stations in Urban Area, Lantau Island and Outlying Islands
  • Shek Wu Hui effluent polishing plant - Main Works Stage 1 - Civil Works for Sludge Treatment Facilities and 132kV Primary Substation
  • Shek Wu Hui Effluent Polishing Plant - E&M Works for Sludge Treatment Facilities, CLP 132kV Primary Substation,Sidestream Treatment Facilities
  • Shek Wu Hui Effluent Polishing Plant - Main Works Stage 1 - Civil Works for Sewage Treatment Facilities
  • Shek Wu Hui Effluent Polishing Plant - Main Works Stage 1- E&M Works for Sewage Treatment Facilities
  • Drainage Maintenance and Construction in Mainland North Districts (2019-2023)
  • Upgrading of West Kowloon and Tsuen Wan sewerage - Phase 1
  • Relocation of Shatin Sewage Treatment Works to Caverns – Site Preparation and Access Tunnel Construction
  • Replacement transformer at SAS Shatin Sewage Treatment Works
  • Upgrading of Kwun Tong Preliminary Treatment Works
  • Enhancement Works for Kwun Tong Sewage Pumping Station
  • Drainage Maintenance and Construction in Mainland South Districts (2019 - 2023)
  • Building and Civil Maintenance and Minor Works to DSD Plants and Facilities (2016 - 2020)
  • Inter-Reservoirs Transfer Scheme - Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir
  • Upgrading of Sewage Pumping Stations and Sewerage along Ting Kok Road
  • Expansion of Sha Tau Kok Sewage Treatment Works, Phase 1 & North District Sewerage, Stage 2 Part 2A
  • Construction of Village Sewerage at Peng Chau and Mui Wo, Modification Works at Tai Po and Siu Ho Wan Sewage Treatment Works and Minor Drainage and Sewerage Works in Urban Area and New Territories
  • Expansion of Sha Tau Kok Sewage Treatment Works Phase 1 and Village Sewage in Tong To
  • Rehabilitation of Trunk Sewers in Kowloon, Shatin and Sai Kung

Back to Participating Organisations


Electrical and Mechanical Services Department

  • District Cooling System (DCS) at Kai Tak Development (KTD) Phase III (Package D) – Water Pipe Laying Works
  • Refurbishment of Hydrofoil Platform No. 3, 4, 6 & 7 at Macau Ferry Terminal
  • Replacement of Lifts L4 and L5 at Ap Lei Chau Market
  • Enhancement works for Modernizing existing lifts at Block H and Block K in Princess Margaret Hospital
  • Retrofitting of High Efficiency Chiller and Associated Installation in PYNEH, QMH, QEH and KH
  • Triennial Term Contract for Operation and Maintenance of Air-conditioning Installations in Various Venues of the Government of the Hong Kong Special Administrative Region Maintained by Hong Kong
  • Triennial Term Contract for Building Services Fitting-out, Replacement and Improvement Works to Various Disciplined Services Venues
  • Provision of Vehicle Examination Equipment and Related Electronics and Control System (VEES) at Tsing Yi Vehicle Examination Centre
  • Supply and Installation of Solar Photovoltaic (PV) Systems for Non-government and Non-profit making Schools (Phase 6)

Back to Participating Organisations


Water Supplies Department

  • Uprating of Tung Chung FW Supply System - Construction of Tung Chung No. 2 FW S/R
  • Water Supply to New Housing Developments in Sheung Shui and Fanling - Mainlaying in Sheung Shui and Fanling Areas
  • Uprating of Chai Wan Salt Water Supply System - Mainlaying and Upgrading of Siu Sai Wan Salt Water Pumping Station
  • Provision of On-site Chlorine Generation Plants at Au Tau, Tsuen Wan and Yau Kom Tau Water Treatment Works
  • Term Contract for Waterworks, District H - Hong Kong Island and Ap Lei Chau
  • Term Contract for Waterworks, District W - New Territories West
  • Mainlaying in Tseung Kwan O
  • Provision of On-site Chlorine Generation Plants at Sheung Shui, Silver Mine Bay, Siu Ho Wan and Ma On Shan Water Treatment Work
  • Uprating of Wan Chai Salt Water Supply System - Mainlaying
  • Construction of Pressure Management and District Metering Installations for the Fresh Water Distribution Systems of the Kowloon East and Sha Tin Major Supply Zones
  • Term Contract for Waterworks, District W - New Territories West
  • Term Contract for Waterworks, District E - New Territories East
  • Improvement of Water Mains - Hong Kong & Islands And New Territories West
  • Construction of Pressure Management and District Metering Installations in Aberdeen, Central, Eastern, Western, Sai Wan, Red Hill, Kowloon West, Tsuen Wan, Sai Kung and Tuen Mun Major Fresh Water Supply Zones
  • In-situ Reprovisioning of Sha Tin Water Treatment Works (South Works) - Advance Works
  • Design, Build and Operate First Stage of Tseung Kwan O Desalination Plant

Back to Participating Organisations


China Metallurgical Group Corporation

  • Uprating of Chai Wan Salt Water Supply System - Mainlaying and Upgrading of Siu Sai Wan Salt Water Pumping Station
  • Tseung Kwan O - Lam Tin Tunnel - Tseung Kwan O Interchange and Associated Works
  • Development of Anderson Road Quarry Site - Road Improvement Works and Pedestrian Connectivity Facilities Works Phase 2A
  • Development of Anderson Road Quarry Site - Road Improvement Works 

Back to Participating Organisations


Victory Trenchless Engineering Company Limited

  • District Cooling System (DCS) at Kai Tak Development (KTD) Phase III (Package D) – Water Pipe Laying Works

Back to Participating Organisations


U-Tech Engineering Company Limited

  • District Cooling System (DCS) at Kai Tak Development (KTD) Phase III (Package D) – Water Pipe Laying Works

Back to Participating Organisations


China Geo-Engineering Corporation

  • Queen’s Hill Development - Sewage Pumping Station Works
  • Preventive Maintenance Programme of roadside Man-made Slopes/Retaining Walls in Urban Region (Package B)
  • Rehabilitation of Trunk Sewers in Kowloon, Shatin and Sai Kung
  • Enhancement Works for Kwun Tong Sewage Pumping Station
  • Landslip Prevention and Mitigation Programme 2018, Package K, Landslip Prevention and Mitigation Works in Hong Kong Island, Kowloon, the New Territories and Outlying Islands
  • Widening of Western Section of Lin Ma Hang Road between Ping Yuen River and Ping Che Road
  • Slope Improvement Works along EAL Phase 5B
  • Landslip Prevention and Mitigation Programme, 2017 Package D, LPMit Works

Back to Participating Organisations


Hong Kong Housing Society

  • Main Contract for Subsidized Sale Flats Project at Shatin Area 36C
  • Foundation, ELS and Pile Cap Works for Proposed Mixed Housing Development at Pak Wo Road, Fanling
  • Construction of Phase 1 Redevelopment of Ming Wah Dai Ha Shau Kei Wan, Hong Kong

Back to Participating Organisations


Henderson Land Development Company Limited

  • Novum Point: No. 3 Marble Road, North Point
  • Proposed Residential Development Project at Ma Sik Road
  • Proposed Redevelopment at No. 22A Kennedy Road, Hong Kong (Union Church)
  • Redevelopment of No. 22A Kennedy Road
  • Composite Development at Main Street Ap Lei Chau
  • Residential Development at Tai Cheong Street
  • Mixed use development project at Castle Peak Road
  • Residential Development at Muk Tai Street
  • Mixed use development project at Muk Tai Street
  • Mixed use development project at Kai Tak
  • Commercial Development at King's Road
  • Composite Development at 30-44 Gillies Avenue South, Hung Hom
  • The Richmond: 62C Robinson Road, Mid-Levels West
  • Residential Development at Fanling Sheung Shui Town Lot No. 262, Fanling North
  • Two • ArtLane
  • Office Development at 2 Murray Road, Central
  • Composite Development at 25-29 Kok Cheung Street, Mong Kok
  • Aquila․Square Mile: No 38 Fuk Chak Street, Mong Kok
  • Composite Development at 286 Tung Chau Street, Sum Shui Po
  • Residential Development at 4A-4P Seymour Road, Mid-Levels
  • Proposed Residential Development Project at Ma Sik Road

Back to Participating Organisations


Grandic Construction Company Limited

  • Novum Point: No. 3 Marble Road, North Point

Back to Participating Organisations


Wing Hing Construction Company Limited

  • New  Integrated Airport Centres Enabling Works

Back to Participating Organisations


Airport Authority Hong Kong

  • Deep Cement Mixing Works (Low Headroom)
  • Main Reclamation Works
  • North Runway Crossway Taxiway
  • Eastern Vehicular Tunnel Advance Works
  • Third Runway and Associated Works
  • Airfield Ground Lighting System
  • Fire Training Facility
  • New Integrated Airport Centres Enabling Works
  • New Integrated Airport Centres - Building and Civil Works
  • Third Runway Concourse Foundation And Substructure works
  • Terminal 2 Foundation and Substructure Works
  • New Automated People Mover System (TRC Line)
  • Existing APM System Modification Works
  • Baggage Handling System
  • TRC and Infrastructure Site Investigation Works
  • Construction Support Infrastructure works
  • Western Supporting Area - Site Office
  • Canteen, Safety Induction Centre and Medical Centre
  • Western Supporting Area - Material Testing Laboratories
  • Western Support Area - Typhoon Shelter, Vehicle Maintenance Facility and Fuel Storage Facility
  • APM/BHS Tunnels and Related Works
  • Concrete Batching Facilities
  • Vehicle Maintenance Services
  • Quay Management Services
  • Firefighting & Rescue Services
  • NCD Enabling Works & APM Depot Fit-Out
  • NCD Main Infrastructure Works
  • Intermodal Transfer Terminal Building
  • North Commercial District Footbridge 1
  • East Hall Expansion Works
  • Revamp of Public Toilets at Terminal Buildings
  • Multipurpose Building in Remaining Midfield Area
  • Terminal 1 Annex Building and Car Park 4 Expansion
  • Proposed Hotel Development at Site A1a  of Skycity Chek Lap Kok Lot No.3

Back to Participating Organisations


Architectural Services Department

  • Construction of Hongkong Post's Headquarters Building at Wang Chin Street, Kowloon
  • Design and Construction of Inland Revenue Tower in Kai Tak Development Area
  • Construction of the East Kowloon Cultural Centre in Kowloon Bay, Kowloon
  • Design and Construction of Redevelopment of Queen Mary Hospital (Phase 1) - Main Works
  • Construction of sports centre, community hall and football pitches in Area 1, Tai Po
  • Design and Construction of a Purpose Built Multi-welfare Services Complex in Area 29 of Kwu Tung North Development Area
  • Construction of a 30-Classroom Primary School at Tonkin Street, Cheung Sha Wan
  • Reprovisioning of Fu Shan Public Mortuary at Sha Tin
  • Signature Project Scheme (Wan Chai District) - Construction of Moreton Terrace Activities Centre
  • Construction of Columbarium at Cape Collison Road in Chai Wan
  • A 30-classroom Secondary School at Site KT2e, Development at Anderson Road, Kwun Tong
  • Design and Construction of Transport Department's Vehicle Examination Centre at Sai Tso Wan Road, Tsing Yi, New Territories
  • Construction of Treasury Building at the junction of Tung Chau Street and Tonkin Street West in Cheung Sha Wan
  • Construction of a 30-classroom Primary School at Shui Chuen O, Sha Tin
  • Construction of Departmental Quarters for Customs and Excise Department at Tseung Kwan O Area 123 (Po Lam Road)
  • Construction of Open Space in Area 47 and 48, North District
  • Design and Construction of Redevelopment of Kwai Chung Hospital (Phase 2) at 3-15 Kwai Chung Hospital Road, New Territories
  • Reinstatement of Shek O Blue Bridge Shek O Headland Picnic Area
  • Provision of temporary report room and server room for refurbishment of new generation report room
  • Refurbishment works of external wall and car parking area
  • Construction of Departmental Quarters for Customs and Exercise Department
  • Alterations, Addition, Maintenance and Repair of Buildings and Lands and Other Properties for which the ASD (Property Services Branch) is Responsible for Central, Peak and Mid-levels
  • Construction of Reprovisioning Facilities at Hong Ning Road Park and Ngau Tau Kok Fresh Water Service Reservoir
  • East Kowloon Cultural Centre
  • Construction of Columbarium & Garden of Remembrance
  • Liantang /Heung Yuen Wai Boundary Control Point Buildings and Associated Facilities
  • Vehicle Examination Centre at Tsing Yi
  • Immigration Headquarters, Tseung Kwan O
  • Design And Construction of Temporary Quarantine Facilities at Penny’s Bay (Phase II)
  • Alternations, Additions, Maintenance and Repair of Buildings and Lands and Other Properties for which the Architectural Services Department (Property Services Branch) is Responsible (Designated Contract Area: Tai Po, North District and Outlying Islands (North))

Back to Participating Organisations


China Overseas Building Construction Limited

  • Proposed Residential Development at New Kowloon Inland Lot No. 6549, Off Hing Wah Street West,Cheung Sha Wan, Kowloon
  • A 30-classroom Secondary School at Site KT2e, Development at Anderson Road, Kwun Tong

Back to Participating Organisations


Sky Asia Properties Limited

  • Proposed Residential Development at New Kowloon Inland Lot No. 6549, Off Hing Wah Street West,Cheung Sha Wan, Kowloon

Back to Participating Organisations


Hing Fu Engineering Company Limited

  • Infrastructure Works for Public Housing Development at Area 54, Tung Chung
  • Walkway Cover in Yau Tsim Wong, Sham Shui Po and Island District

Back to Participating Organisations


Build King Group

  • Kai Tak Development - Stage 3B Infrastructure at Former North Apron Area
  • Construction of Columbarium at Cape Collison Road in Chai Wan
  • Construction of a 30-classroom Primary School at Shui Chuen O, Sha Tin
  • Site Formation and Infrastructure Works for Police Facilities in Kong Nga Po
  • Cross Bay Link, Tseung Kwan O - Road D9 and Associated Works
  • Intermodal Transfer Terminal Building at Airport
  • North Commercial District Footbridge 1 at Airport
  • East Hall Expansion Works at Airport
  • Station Enhancement Works at Lo Wu
  • Admiralty SCL Related Works Project
  • Main Contract For the Construction of 300 Place Student Hostel At New Asia College Of The Chinese University Of Hong Kong
  • Proposed Residential Development Project at Ma Sik Road
  • Proposed Residential Development at Tuen Mun Town Lot No. 520. Kwun Chui Road
  • Tung Chung New Town Extension – Reclamation and Advance Works

Back to Participating Organisations


Richwell Civil Engineering Limited

Richwell Engineering Limited

  • Kai Tak Development - Stage 3B Infrastructure at Former North Apron Area
  • Kwu Tung North New Development Area, Phase 1: Site Formation and Infrastructure Works
  • Revitalization of Tsui Ping River
  • Kwu Tung North New Development Area Phase 1
  • Cycle track between Tsuen Wan and Tuen Mun - Advance Works

Back to Participating Organisations


Zhen Hua Engineering Company Limited

  • Handling of Surplus Public Fill
  • North Runway Crossway Taxiway at Airport
  • Tseung Kwan O – Lam Tin Tunnel
  • Main Reclamation Works at Airport
  • Midfield Apron Development Works at Airport

Back to Participating Organisations


China Harbour Engineering Company Limited

  • Handling of Surplus Public Fill
  • Midfield Apron Development Works at Airport

Back to Participating Organisations


Chun Yip Waterworks Construction (HK) Limited

  • Uprating of Tung Chung FW Supply System - Construction of Tung Chung No. 2 FW S/R
  • Construction of Pressure Management and District Metering Installations for the Fresh Water Distribution Systems of the Kowloon East and Sha Tin Major Supply Zones

Back to Participating Organisations


Chung Hing Waterworks Engineering Company Limited

  • Uprating of Tung Chung FW Supply System - Construction of Tung Chung No. 2 FW S/R

Back to Participating Organisations


Ming Hing Waterworks Engineering Company Limited

Ming Hing Civil Contractors Limited

  • LPMitP-2014, Package B, Landslip Prevention and Mitigation Works
  • Landslip Prevention and Mitigation Programme, 2014, Package I, Landslip Prevention and Mitigation Works
  • Term Contract for Waterworks, District W - New Territories West
  • Term Contract for Waterworks, District E - New Territories East
  • Improvement of Water Mains - Hong Kong & Islands And New Territories West
  • Construction of Pressure Management and District Metering Installations in Aberdeen, Central, Eastern, Western, Sai Wan, Red Hill, Kowloon West, Tsuen Wan, Sai Kung and Tuen Mun Major Fresh Water Supply Zones
  • Landslip Prevention and Mitigation Programme, 2014, Package B, Landslip Prevention and Mitigation Works
  • Landslip Prevention and Mitigation Programme, 2014, Package I, Landslip Prevention and Mitigation Works
  • In-situ Reprovisioning of Sha Tin Water Treatment Works (South Works) - Advance Works

Back to Participating Organisations


Chevalier International Holdings Limited

Chevalier (Aluminium Engineering) Limited

Chevalier (Building Supplies & Engineering) Limited 

Chevalier (Construction) Company Limited

Chevalier (E & M Contracting) Limited 

Chevalier (Envirotech) Limited

Chevalier (HK) Limited

Lam Woo & Company Limited

  • Upgrading of Kwun Tong Preliminary Treatment Works
  • Provision of On-site Chlorine Generation Plants at Sheung Shui, Silver Mine Bay, Siu Ho Wan and Ma On Shan Water Treatment Works
  • URA Project DL-6: YTM Proposed Composite Development at Tai Kok Tsui
  • Proposed Residential Redevelopment at 292 Prince Edward Road West, HK
  • Proposed Church Facilities Residential Care Home and Senior Hostel Development
  • Expansion of Blood Transfusion Service Headquarters
  • Extension of Operating Theatre Block for Tuen Mun Hospital
  • Upgrading of Kwun Tong Preliminary Treatment Works
  • Lift Replacement at Trafalgar Court
  • Lift Modernization at Kowloon Plaza

Back to Participating Organisations


Wo Hing Construction Company Limited

  • Term Contract for Waterworks, District H – Hong Kong Island and Ap Lei Chau
  • Construction of an additional Sewage Rising main between Tung Chung and Siu Ho Wan and associated works

Back to Participating Organisations


China International Water & Electric Corporation

  • Water Supply to New Housing Developments in Sheung Shui and Fanling - Mainlaying in Sheung Shui and Fanling Areas
  • CEDD Maintenance Contract for Seawalls and Navigation Channels (2016-2021)

Back to Participating Organisations


Torishima (Hong Kong) Limited

  • Provision of On-site Chlorine Generation Plants at Au Tau, Tsuen Wan and Yau Kom Tau Water Treatment Works

Back to Participating Organisations


MTR Corporation Limited

  • Shatin to Central Link: Building Services for SCL Hong Kong Island Section
  • Station Enhancement Works at Lo Wu
  • Admiralty SCL Related Works Project
  • Slope Improvement Works along EAL Phase 5B
  • Exhibition Centre Station & Western Approach Tunnel
  • Hung Hom Station and Stabling Sidings
  • Noise Mitigation Works at Viaduct of Yuen Long
  • CEN chiller replacement
  • NSL Cross Harbour Tunnels
  • Lohas Park Package 6
  • Replacement of Air-Cooled Chillers at MTR Stations and Depots
  • Installation/ Replacement of Sliencer with Acoustic and Associated Ductwork
  • Reprovisioning of Harbour Road Sports Centre and Wan Chai Swimming Pool
  • Building Services for SCL Hong Kong Island Section

Back to Participating Organisations


Sino Group

  • Silversands - Proposed Residential Development at S.T.T.L. 611, Whitehead, Ma On Shan, Sha Tin, N.T.
  • Proposed Composite Development at TPTL228, Fo Yin Road, Pak Shek Kok, New Territories Superstructure Main Contract
  • Lift Modernization at Kowloon Plaza

Back to Participating Organisations


Urban Renewal Authority

  • Proposed Residential Development at KIL11254, Reclamation Street, Mongkok, Street/ Shantung, Kowloon 
  • Alteration, Reinstatement and Renovation Works for Rehousing Block at 466 Des Voeux Road West
  • YTM Proposed Composite Development at Tai Kok Tsui

Back to Participating Organisations


K.H. Foundations Limited

  • Mixed use development project at Kai Tak
  • Proposed Residential Development at KIL11254, Reclamation Street, Mongkok, Street/ Shantung
  • Foundation, ELS, Pile Cap & Basement Slab Works for The proposed Residential Development at Kai Tak

Back to Participating Organisations


Junic Construction Company Limited

  • Alteration, Reinstatement and Renovation Works for Rehousing Block at 466 Des Voeux Road West

Back to Participating Organisations


Munsang College

  • Proposed Assemnly Hall at Munsang College

Back to Participating Organisations


China State Construction Engineering (Hong Kong) Limited

  • Development at Anderson Road – Site Formation and Associated Infrastructure Works
  • Tseung Kwan O - Lam Tin Tunnel - Main Tunnel and Associated Works
  • Relocation of Sha Tin Sewage Treatment Works to Caverns – Site Preparation and Access Tunnel Construction
  • Hiram's Highway Improvement Stage 1 - between Clear Water Bay Road and Marina Cove
  • CWB Tunnel (Slip Road 8 Section)
  • Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road – Section between Scenic Hill and Hong Kong Boundary Crossing Facilities
  • Construction Support Infrastructure Works at Airport
  • APM & BHS Tunnels on the Existing Airport Island
  • NCD Enabling Works & APM Depot Fit-Out at Airport
  • NCD Main Infrastructure Works at Airport
  • Exhibition Centre Station & Western Approach Tunnel
  • Foundation, ELS and Pile Cap Works for Proposed Mixed Housing Development at Pak Wo Road, Fanling
  • Construction of Public Housing Development at Tuen Mun Area 54 Sites 3 & 4 (East)
  • Construction of Public Housing Development at Tsing Hung Road, Tsing Yi
  • Foundation for Public Housing Development at Chiu Shun Road, Tsueng Kwan O
  • Foundation, Site Formation, Road and Drainage for Public Rental Housing Development at Tai Po Area 9, Tai Po
  • Foundation for Public Housing Development at Yip Wong Road Phase 1 and Phase 2, Tuen Mun
  • Foundation for Public Housing Development at Kai Tak Sites 2B5, 2B6
  • Foundation and Site Formation for Subsidised Sale Flats Development and Public Rental Housing Development at Ma On Shan Road (SSF) and Hang Tai Road, Ma On Shan Area 86B Phase 1 (PRH)
  • NSL Cross Harbour Tunnels

Back to Participating Organisations


Hong Kong Housing Authority

  • Foundation for Public Housing Development at Ching Hong Road North Phases 1 and 2
  • Foundation for Public Housing Development at Long Bin Phase 1
  • Ground Investigation Term Contract B (2019-2021)
  • Foundation for Public Housing Development at Tuen Mun Area 29 West
  • Foundation for Public Housing Development at Anderson Road Quarry Site RS-1
  • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phases 7 and 8
  • Construction of Public Rental Housing Redevelopment at Pak Tin Estate Phases 11
  • Foundation for Public Housing Development at Tung Chung Area 99
  • Foundation for Public Housing Development at North West Kowloon Reclamation (NWKR) Site 1 (East)
  • Construction of Public Housing Development at Hiu Ming Street
  • Construction of Subsidised Sale Flats Development at Diamond Hill Comprehensive Development Area
  • Construction of Public Housing Developments at North West Kowloon Reclamation Site 6 and Fat Tseung Street West
  • Construction of Subsidised Sale Flats Development at Queen's Hill Site 1 Phase 3 and Portion of Phase 6, Fanling
  • Construction of District Open Space adjoining San Po Kong Public Housing. Development
  • Construction of  Public Rental Housing Development at Chung Nga Road East, Tai Po
  • Construction of Public Rental Housing Development at Queen's Hill Site 1 Phase 1 and Portion of Phase 6, Fanling
  • Foundation and Site Formation For Public Housing Development at Lei Yue Mun Phase 4 at Yan Wing Street, Yau Tong
  • Construction of Public Housing Development at Tuen Mun Area 54 Sites 1 & 1A
  • Construction  of  Public Rental Housing Development at Near Lai King Hill Road, Kwai Chung and Extension of Footbridge and Cycle Parking Area at Choi Yuen Road, Sheung Shui
  • Construction of Public Housing Development at Lai Cho Road, Kwai Chung
  • Construction of Public Housing Development at Tuen Mun Area 54 Sites 3 & 4 (East)
  • Construction of Public Rental Housing Development at Choi Yuen Road Sites 3 & 4, Sheung Shui
  • Construction of Public Housing Development at Choi Fook Estate Phase 3 and Sports Centre
  • Construction of Public Rental Housing Development at Queen's Hill Site 1 Phases 2, 4 & 5 and Portion of Phase 6 cum Alteration and Addition Works at Ching Ho Estate
  • Construction of Subsidised Sale Flats Development at Tung Chung Area 54
  • Construction of Public Rental Housing Development Phases 1 & 2 and Subsidised Sale Flats Development at Diamond Hill Comprehensive Development Area
  • Construction of Subsidised Sale Flats Development at Ma On Shan Road and Public Housing Development
    at Hang Tai Road, Ma On Shan Area 86B Phase 1
  • Construction of Public Housing Development at Tsing Hung Road, Tsing Yi
  • Construction of Subsidised Sale Flats Development at On Muk Street Phase 1, Shek Mun, Sha Tin
  • Construction of Public Rental Housing Development at Shek Mun Estate Phase
  • Construction of Public Housing Development at Tai Po Area 9, Tai Po
  • Construction of Public Rental Housing Development at Wing Tai Road, Chai Wan
  • Construction of Public Housing Development at Chai Wan Road, Chai Wan
  • Foundation for Public Housing Development at Fanling Area 36 Phase 4, Fanling
  • Foundation for Public Housing Development at Tung Chung Area 100
  • Foundation for Public Housing Development at Chiu Shun Road, Tsueng Kwan O
  • Foundation, Site Formation, Road and Drainage for Public Rental Housing Development at Tai Po Area 9, Tai Po
  • Foundation for Subsidised Sale Flats Development at Ko Shan Road
  • Foundation for Public Housing Development at Yip Wong Road Phase 1 and Phase 2, Tuen Mun
  • Foundation for Public Housing Development at Kai Tak Site 2B2
  • Foundation for Public Housing Development at Hin Fat Lane, Tuen Mun and Java Road, North Point
  • Foundation and Demolition for Public Rental Housing Development at Pak Tin Estate Phase 10
  • Foundation for Public Housing Development at Kai Tak Sites 2B5, 2B6
  • Foundation and Site Formation for Subsidised Sale Flats Development and Public Rental Housing Development at Ma On Shan Road (SSF) and Hang Tai Road, Ma On Shan Area 86B Phase 1 (PRH)
  • Advance Civil Engineering Works for Public Housing Development Projects Batch 9
  • Underground Utilities Investigation Term Contract B (2019- 2021)
  • Road Improvement Works at Ma On Shan, Sha Tin
  • Underground Utilities Investigation Term Contract A (2019- 2021)
  • Ground Investigation Term Contract A (2019-2021)
  • Ground Investigation Term Contract C (2019-2021)
  • Ground Investigation Term Contract D (2019- 2021)

Back to Participating Organisations


China Road and Bridge Corporation

  • Tseung Kwan O - Lam Tin Tunnel - Road P2 and Associated Works
  • Cross Bay Link, Tseung Kwan O - Main Bridge and Associated Works
  • Drainage Maintenance and Construction in Mainland North Districts
  • Highways Department Term Contract (Management and Maintenance of High Speed Roads in New Territories West and Kowloon, and Roads in Hong Kong Port Area 2016-2022)
  • Highways Department Term Contract (Management and Maintenance of Roads in Sha Tin, Sai Kung and Islands Districts excluding Expressways and High Speed Roads 2018 - 2024)
  • Eastern Vehicular Tunnel Advance Works
  • Third Runway Concourse Foundation and Substructure Works
  • Liantang / Heung Yuen Wai Boundary Control Point, Site Formation and Infrastructure Works  - Contract 6
  • Kai Tak Development – Stage 3 Infrastructure Works for Developments at the Southern part of the Former Runway

Back to Participating Organisations


Continental Engineering Corporation

  • Kai Tak Development - Stage 2 Infrastructure Works for Developments at the Southern Part of the Former Runway
  • Liantang / Heung Yuen Wai Boundary Control Point, Site Formation and Infrastructure Works - Contract 6

Back to Participating Organisations


Hop Lee Builders Company Limited

  • Proposed Assemnly Hall at Munsang College

Back to Participating Organisations


Penta Ocean Construction Company Limited

  • Construction of an additional Sewage Rising main between Tung Chung and Siu Ho Wan and Associated Works
  • Construction of Treasury Building at the junction of Tung Chau Street and Tonkin Street West in Cheung Sha Wan
  • Kai Tak Development – Stage 4 Infrastructure at the Former Runway and South Apron
  • Mainlaying in Tseung Kwan O
  • Construction of An Integrated Rehabilitation Services Complex at Ex-Siu Lam Hospital Site in Tuen Mun
    NSL Cross Harbour Tunnels

Back to Participating Organisations


Chit Cheung Construction Company Limited

  • Kai Tak Development - Stage 2 Infrastructure Works for Developments at the Southern Part of the Former Runway

Back to Participating Organisations


Hong Kong Science and Technology Park

  • InnoCell at Pak Shek Kok
  • Development of IE2.0 Project C Advanced Manufacturing Centre at TKO Industrial Estate

Back to Participating Organisations


Chinachem Group

  • Basement and Superstructure Works for the Proposed Residential Development at Lot No. 1068 In Survey District, No.3 Off Anderson Road, Kwun Tong
  • Ho Man Tin Station Package Two Property Development

Back to Participating Organisations


Associated Engineers Limited

  • CLP - CPPS Lighting & Small Power Equipment Service
  • HKHA - RHS Term Contract (2019/2022) 
  • Lift Maintenance of  Pristine Villa
  • ARCS  O&M Choi Ming Court
  • ARCS  O&M Lai Yan Court
  • Lift Maintenance of  Fu Ning Garden
  • ARCS O&M Yau Lai Estate

Back to Participating Organisations


Hip Hing Engineering Company Limited

  • Design and Construction of Inland Revenue Tower at Kai Tak Development Area
  • Design and Construction of Transport Department's Vehicle Examination Centre at Sai Tso Wan Road, Tsing Yi, New Territories
  • Two Taikoo Place
  • Office Development at 2 Murray Road, Central
  • Lohas Park Package 6
  • Proposed Residential Development at Ap Lei Chau Inland Lot No. 136
  • Kai Tak Area 1F Site 2
  • Off Sin Fat Road, Kwun Tong
  • Kai Tak Area 1E Site 2, Kai Tak, Kowloon (Sogo)
  • CLP Shing Kai Road Substation Civil Works
  • Construction of  Public Rental Housing Development at Chung Nga Road East, Tai Po
  • Vehicle Examination Centre at Tsing Yi
  • Construction of Public Rental Housing Development at Queen's Hill Site 1 Phase 1 and Portion of Phase 6, Fanling
  • Austin Road Pedestrian Linkage System
  • InnoCell at Pak Shek Kok
  • Immigration Headquarters, Tseung Kwan O
  • Kai Tak Sports Park

Back to Participating Organisations


Sunley Engineering & Construction Company Limited

  • Lamma Power Station Extension - Foundation Works for Unit L12
  • Ho Man Tin Station Package Two Property Development
  • Foundation for Public Housing Development at Fanling Area 36 Phase 4, Fanling
  • Foundation for Public Housing Development at Tung Chung Area 100

Back to Participating Organisations


Samsung C&T Corporation

  • Tung Chung New Town Extension – Reclamation and Advance Works

Back to Participating Organisations


Global Switch

  • Global Switch Hong Kong 1 Buildings 3, 4 and 5 for Data Centre at Tseung Kwan O Industrial Estate

Back to Participating Organisations


Dragages Hong Kong Limited

  • Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 2
  • Tuen Mun-Chek Lap Kok Link - Northern Connection Sub-sea Tunnel Section
  • Reprovisioning of Harbour Road Sports Centre and Wan Chai Swimming Pool
  • Office Tower Development at Airport
  • Causeway Bay Typhoon Shelater to Admiratly Tunnels

Back to Participating Organisations


Wecon Construction & Engineering Limited

  • Proposed Redevelopment at No. 22A Kennedy Road, Hong Kong (Union Church)
  • Construction of Departmental Quarters for Customs and Exercise Department
  • Silversands - Proposed Residential Development at S.T.T.L. 611, Whitehead, Ma On Shan
  • Proposed Composite Development at TPTL228, Fo Yin Road, Pak Shek Kok, New Territories Superstructure Main Contract
  • Redevelopment of   No. 22A Kennedy Road

Back to Participating Organisations


CR Construction Company Limited

  • Development at 286 Tung Chau Street
  • Composite Development at 286 Tung Chau Street, Sum Shui Po
  • Proposed Redevelopment at 25-31 Sugar Street, Causeway Bay
  • Main Contract forJockey Club One Health Tower for CityU
  • Proposed Residential Development at Yau Tong Inland Lot No:44 at the Junction of Shung Shun Street and Yan Yue Wai
  • Construction of Subsidised Sale Flats Development at On Muk Street Phase 1, Shek Mun, Sha Tin
  • Foundation and Main Works Contract   for DHL Central Asia Hub Second Expansion  at No.6 South Perimeter Road

Back to Participating Organisations


Bestrich Engineering Limited

  • Construction of Sitting-out area at Hang Ming Street (Area 90 in Ma On Shan)

Back to Participating Organisations


Kaden Construction Limited

  • Liantang / Heung Yuen Wai Boundary Control Point, Site Formation and Infrastructure Works  - Contract 6

Back to Participating Organisations


Shui On Construction Company Limited

  • Design and Construction of a Purpose Built Multi-welfare Services Complex in Area 29 of Kwu Tung North Development Area
  • Design and Construction of Redevelopment of Kwai Chung Hospital (Phase 2) at 3-15 Kwai Chung Hospital Road, New Territories
  • Construction of Public Rental Housing Development at Wing Tai Road, Chai Wan
  • Construction of Public Housing Development at Chai Wan Road, Chai Wan

Back to Participating Organisations


K.Wah Concrete Company Limited

  • Concrete Batching Facilities at Airport

Back to Participating Organisations


Unistress Building Construction Limited

  • Proposed Chung Chi Student Development Complex at Chung Chi College of the Chinese University of Hong Kong
  • Proposed Hotel Development at Site A1a  of Skycity Chek Lap Kok Lot No.3 at Hong Kong International Airport

Back to Participating Organisations


Wheelock and Company Limited

  • Proposed House Development at No.1, Plantation Road
  • Foundation, ELS and Site Formation Works for Proposed Residential Development at New Kowloon Inland Lot 6579, Lung Cheung Road

Back to Participating Organisations


Environmental Protection Department

  • O. Park 2

Back to Participating Organisations


Highways Department

  • Central Kowloon Route - Kai Tai West
  • Central Kowloon Route - Kai Tai East
  • Re-painting of Noise Barriers and Noise Enclosures at Lai Chi Kok Viaduct
  • Hiram's Highway Improvement Stage 1 - between Clear Water Bay Road and Marina Cove
  • Central – Wan Chai Bypass, Tunnel Buildings, System & Fittings, and works associated with Tunnel Commissioning
  • CWB Tunnel (NP section) and IEC Link
  • CWB Tunnel (Slip Road 8 Section)
  • Central Kowloon Route - Yau Ma Tei East
  • Central Kowloon Route - Yau Ma Tei West
  • Central Kowloon Route - Central Tunnel
  • Management, Operation, Installation and Maintenance Contract of the Public Lighting System in Kowloon and New Territories East
  • Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 9
  • Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways – Package 3 Contract 1
  • Provision of Barrier-Free Access Facilities for Highway Structure – Phase 3 Contract 5
  • Hong Kong – Zhuhai – Macao Bridge Hong Kong Link Road – Section between Scenic Hill and Hong Kong Boundary Crossing Facilities
  • Hong Kong – Zhuhai – Macao Bridge Hong Kong Boundary Crossing Facilities – Phase 2 and Other Works
  • Tuen Mun-Chek Lap Kok Link – Northern Connection Sub-sea Tunnel Section
  • Tuen Mun-Chek Lap Kok Link – Northern Connection Tunnel Buildings, Electrical and Mechanical Works
  • Footbridge near MTR Kowloon Bay Station Exit B
  • Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung
  • Highways Department Term Contract - Management and Maintenance of Roads in Kowloon East Excluding Expressways and High Speed Roads (2018-2024)
  • Preventive Maintenance Programme of roadside Man-made Slopes/Retaining Walls in Urban Region (Package B)
  • Highways Department Term Contract - Management and Maintenance of Roads on Hong Kong Island excluding High Speed Roads ( 2017-2023)
  • Widening of Western Section of Lin Ma Hang Road between Ping Yuen River and Ping Che Road
  • Highways Department Term Contract - Management and Maintenance of Expressways and High Speed Roads in New Territories East, Kowloon East and Hong Kong Island (2019-2025)
  • Highways Department Term Contract - Management and Maintenance of Roads in New Territories West excluding High Speed Roads (2015 - 2021)
  • Highways Department Term Contract - Management and Maintenance of High Speed Roads in New Territories West and Kowloon, and Roads in Hong Kong Port Area (2016-2022)
  • Supply and Installation of Motorized Roller Blinds at Façade facing the West Direction at Passenger Clearance Building of Hong Kong Zhuhai-Macao Bridge Hong Kong Port
  • Highways Department Term Contract  - Management and Maintenance of Roads in Sha Tin, Sai Kung and Islands Districts excluding Expressways and High Speed Roads 2018 - 2024)
  • Highways Department Term Contract - Management and Maintenance of Roads in Kowloon West excluding Expressways and High Speed Roads (2020-2026)
  • Central Kowloon Route Yau Ma Tei East
  • Road Improvement Works in West Kowloon Reclamation Development
  • Walkway Cover in Yau Tsim Wong, Sham Shui Po of island District

Back to Participating Organisations


Gammon Construction Limited

  • Central Kowloon Route - Kai Tai West
  • Tuen Mun-Chek Lap Kok Link - Northern Connection Tunnel Buildings, Electrical and Mechanical Works
  • APM/BHS Tunnels and Related Works at Airport
  • Concrete Batching Facilities at Airport
  • Shatin to Central Link: Building Services for SCL Hong Kong Island Section
  • M+ Museum
  • L2 contract of Lyric Theatre Complex and Extended Basement
  • Black Point Power Station Linil - D2 Early Civil Works
  • Proposed Residential Development at KIL 11257, Sheung Shing Street
  • Replacement of Air-Cooled Chillers at MTR Stations and Depots
  • Global Switch Hong Kong 1 Buildings 3, 4 and 5 for Data Centre at Tseung Kwan O Industrial Estate
  • Proposed residential development at NKIL No. 6563 Kai Tak Area 1L, Site 2, Kai Tak Kowloon
  • Development of IE2.0 Project C Advanced Manufacturing Centre at TKO Industrial Estate
  • The University of Hong Kong Medical Complex Extension at No. 21 Sassoon Road
  • Foundation and Site Formation For Public Housing Development at Lei Yue Mun Phase 4 at Yan Wing Street, Yau Tong
  • Design And Construction of Temporary Quarantine Facilities at Penny’s Bay (Phase II)
  • Point Power Station D2 Project – Early Works
  • Proposed House Development at No.1, Plantation Road
  • Ground Investigation Term Contract C (2019-2021)
  • Demolition and Foundation Works for Redevelopment of Prince of Wales Hospital Phase 2 (Stage 1) Project
  • Building Services for SCL Hong Kong Island Section
  • MTR SCL Contract 1164B – Building Services for SCL Hong Kong Island Section

Back to Participating Organisations


Chiu Hing Construction & Transportation Company Limited

  • Highways Department Term Contract - Management and Maintenance of Roads on Hong Kong Island excluding High Speed Roads ( 2017-2023)

Back to Participating Organisations


CLP Power Hong Kong Limited

CLPe Solutions Limited

  • Main Contract for the student residence development at clear water bay, kowloon for the HKUST
  • CLP Civil and Structure Refurbishment in Castle Peak Power Station, Black Point Power Station and Penny Bay Power Station
  • Distribution Cable Trenching and Laying Works
  • Transmission Cable Installation Works
  • Black Point Power Station Linil - D2 Early Civil Works
  • CLP Shing Kai Road Substation Civil Works
  • D1 Power Station of CLP
  • CLP - CPPS Lighting & Small Power Equipment Service
  • Management, Operation, Installation and Maintenance Contract of the Public Lighting System in Kowloon and New Territories East

Back to Participating Organisations


Welcome Construction Company Limited

  • Drainage Maintenance and Construction in Mainland South Districts (2019 - 2023)
  • Provision of Barrier-Free Access Facilities for Highway Structure - Phase 3 Contract 5
  • Highways Department Term Contract - Management and Maintenance of Expressways and High Speed Roads in New Territories East, Kowloon East and Hong Kong Island (2019-2025)

Back to Participating Organisations


Lanon Development Limited

  • Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 9

Back to Participating Organisations


Sunnic Engineering Limited

  • The Richmond: 62C Robinson Road, Mid-Levels West

Back to Participating Organisations


Sheen Billion Development Limited

  • Re-painting of Noise Barriers and Noise Enclosures at Lai Chi Kok Viaduct

Back to Participating Organisations


Paul Y. Construction Company Limited

  • Design and Construction of Redevelopment of Queen Mary Hospital (Phase 1) - Main Works
  • Fanling North New Development Area, Phase 1: Fanling Bypass Eastern Section (Shung Him Tong to Kau Lung Hang)
  • Building and Civil Maintenance and Minor Works to DSD Plants and Facilities (2016 - 2020)
  • Central Kowloon Route - Kai Tai East
  • Third Runway and Associated Works at Airport
  • Fire Training Facility at Airport
  • Lamma Power Station Extension Civil and Building Works for Unit 11
  • Main Contract Works for Proposed Residential Development at NKIL 6562, Kai Tak
  • Main Contract for the student residence development at the HKUST
  • CLP Civil and Structure Refurbishment in Castle Peak Power Station, Black Point Power Station and Penny Bay Power Station
  • Mixed use development project at Muk Tai Street
  • Multipurpose Building in Remaining Midfield Area at Airport
  • 油塘高超道港鐵通風大樓地基地盤
  • Basement and Superstructure Works for the Proposed Residential Development at Lot No. 1068 In Survey District, No.3 Off Anderson Road
  • Residential Development at 4A-4P Seymour Road, Mid-Levels
  • Main Contract for Academic Building at No. 3 Sassoon Road for the University of Hong Kong
  • Construction of Public Housing Development at Choi Fook Estate Phase 3 and Sports Centre
  • Construction of Public Rental Housing Development at Queen's Hill Site 1 Phases 2, 4 & 5 and Portion of Phase 6 cum Alteration and Addition Works at Ching Ho Estate

Back to Participating Organisations


China Railway 15 Bureau Group Company Limited

  • Fanling North New Development Area, Phase 1: Fanling Bypass Eastern Section (Shung Him Tong to Kau Lung Hang)

Back to Participating Organisations


Excel Engineering Company Limited

  • Provision of Barrier-free Access Facilities for Highway Structures – Phase 3 Contract 9
  • Advance Civil Engineering Works for Public Housing Development Projects Batch 9

Back to Participating Organisations


Vernaltex Company Limited

  • Provision of Barrier-Free Access Facilities for Highway Structure - Phase 3 Contract 5 for Highways Department

Back to Participating Organisations


Wai Luen Development Limited

  • Lamma Power Station Extension – Light Oil Storage Tank No.2

Back to Participating Organisations


Hongkong Electric Company, Limited

  • Lamma Power Station Extension Civil and Building Works for Unit 11
  • Lamma Power Station Extension Erection Works for Unit 11
  • Lamma Power Station Extension – Light Oil Storage Tank No.2
  • Lamma Power Station Extension - Foundation Works for Unit L12

Back to Participating Organisations


Shun Yuen Construction Company Limited

  • Highways Department Term Contract - Management and Maintenance of Roads in New Territories West excluding High Speed Roads (2015 - 2021)
  • Highways Department Term Contract - Management and Maintenance of Roads in Kowloon West excluding Expressways and High Speed Roads (2020-2026)

Back to Participating Organisations


Sun Fook Kong Construction Limited

  • Reinstatement of Shek O Blue Bridge Shek O Headland Picnic Area Architectural Services Department
  • Refurbishment works of external wall and car parking area for Architectural Services Department
  • Highways Department Term Contract - Management and Maintenance of Roads in Kowloon East Excluding Expressways and High Speed Roads (2018-2024)
  • Supply and Installation of Motorized Roller Blinds at Facade facing the West Direction at Passenger Clearance Building of Hong Kong Zhuhai-Macao Bridge Hong Kong Port
  • Integrated Airport Centres - Building and Civil Works
  • Construction of Public Rental Housing Development Phases 1 & 2 and Subsidised Sale Flats Development at Diamond Hill Comprehensive Development Area
  • Construction of Subsidised Sale Flats Development at Ma On Shan Road and Public Housing Development at Hang Tai Road, Ma On Shan Area 86B Phase 1
  • Foundation and Main Works Contract for DHL Central Asia Hub Second Expansion at No.6 South Perimeter Road at Aiport

Back to Participating Organisations


Leighton Contractors (Asia) Limited

  • Construction of the East Kowloon Cultural Centre
  • Tseung Kwan O - Lam Tin Tunnel - Main Tunnel and Associated Works
  • Central -  Wan Chai Bypass, Tunnel Buildings, System & Fittings, and works associated with Tunnel Commissioning
  • Terminal 2 Foundation and Substructure Works at Airport
  • Exhibition Centre Station & Western Approach Tunnel
  • Terminal 1 Annex Building and Car Park 4 Expansion at Airport
  • Construction of Columbarium & Garden of Remembrance
  • Hung Hom Station and Stabling Sidings
  • Liantang / Heung Yuen Wai Boundary Control Point Buildings and Associated Facilities

Back to Participating Organisations


Kuly Construction & Engineering Company Limited

  • Infrastructural Works for Public Housing Development at Chung Nga Road and Area 9, Tai Po
  • Kwu Tung North and Fanling North New Development Areas, Phase 1: Development of Long Valley Nature Park
  • Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways – Package 3 Contract 1
  • Footbridge near MTR Kowloon Bay Station Exit B

Back to Participating Organisations


KML Engineering Limited

  • Installation/ Replacement of Sliencer with Acoustic and Associated Ductwork for MTR Corporation Limited 

Back to Participating Organisations


Alchmex International Construction Limited

  • Central Kowloon Route - Kai Tai East

Back to Participating Organisations


Hospital Authority

  • Demolition and Foundation Works for Redevelopment of Prince of Wales Hospital Phase 2 (Stage 1) Project
  • Expansion of Blood Transfusion Service Headquarters
  • Extension of Operating Theatre Block for Tuen Mun Hospital

Back to Participating Organisations


China Railway Group Limited

  • Widening of Tai Po Road (Shatin Section)
  • CWB Tunnel (NP section) and IEC Link

Back to Participating Organisations


China Railway First Group Company Limited

  • Widening of Tai Po Road (Shatin Section)

Back to Participating Organisations


Fujita Corporation

  • North Runway Crossway Taxiway at Airport
  • Midfield Apron Development Works at Airport

Back to Participating Organisations


New World Development Company Limited

  • Proposed Development at Cheung Chun Street
  • Proposed Composite Development at No. 74 Waterloo Road, Kowloon
  • Artisan Garden

Back to Participating Organisations


Hip Seng Construction Company Limited

  • Proposed Development at Cheung Chun Street

Back to Participating Organisations


Kin Wing Foundations Company Limited

Kin Wing Engineering Company Limited 

  • ITOB of Hong Kong Jockey Club
  • Foundation for Public Housing Development at Kai Tak Site 2B2
  • Foundation, ELS and Site Formation Works for Proposed Residential Development at New Kowloon Inland Lot 6579, Lung Cheung Road

Back to Participating Organisations


Shanghai Tunnel Engineering Company Limited

  • Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site
  • Tseung Kwan O - Lam Tin Tunnel - Tseung Kwan O Interchange and Associated Works

Back to Participating Organisations


Kwan On Construction Company Limited

  • Landslip Prevention and Mitigation Programme 2017, Package K, Landslip Prevention and Mitigation Works
  • Development of Anderson Road Quarry site - Pedestrian Connectivity Facilities Works, Phase 1
  • Road Improvement Works at Ma On Shan

Back to Participating Organisations


Sang Hing Civil Contractors Company Limited

  • Kwu Tung North and Fanling North New Development Areas, Phase 1: Development of Long Valley Nature Park
  • Development of Columbarium at Sandy Ridge Cemetery - Infrastructural Works at Man Kam To Road and Lin Ma Hang Road

Back to Participating Organisations


Tsun Yip Waterworks Construction Company Limited

  • Site Formation and InfrastructureWorks near Tong Hang Road and Tsz Tin Road in Area 54, Tuen Mun
  • Site Formation Works at Remaining Part of Tai Po Area 39
  • Site Formation and Associated Infrastructural Works for Development of Columbarium at Sandy Ridge Cemetery

Back to Participating Organisations


SKEC

  • Central Kowloon Route - Yau Ma Tei East
  • Central Kowloon Route - Yau Ma Tei West
  • Kai Tak Development - Stage 5B Infrastructure Works at the Former North Apron Area
  • Central Kowloon Route Yau Ma Tei East

Back to Participating Organisations


Kum Shing Construction Company Limited

  • Expansion of Sha Tau Kok Sewage Treatment Works, Phase 1 & North District Sewerage, Stage 2 Part 2A
  • Distribution Cable Trenching and Laying Works
  • Transmission Cable Installation Works
  • Noise Mitigation Works at Viaduct of Yuen Long
  • Expansion of Sha Tau Kok Sewage Treatment Works Phase 1 and Village Sewage in Tong To

Back to Participating Organisations